St. James Cemetery
CATEGORY: Slope Stabilization, Erosion Control and Detailed Design
OBJECTIVE: Slope destabilization caused by concentrated stormwater flow and uncontrolled fill is to be remediated using SRT plate piles and stormwater management techniques
SLOPE HEIGHT: 25 metres
CLIENT: St. James Cemetery
CONTRACTOR: Hobden Construction
PROJECT HIGHLIGHTS: Slope Remediation Options, Slope Stability, Erosion Risk Analysis, Rip Rap Buttress, Armour Stone Retaining Wall, SRT Plate Pile Installation, Helical Piles, Interceptor Trench for Stormwater Management